
Real job — pulled straight from swjtechnology’s careers page · Verified May 24, 2026 · No reposts.
Job description
swjtechnology is hiring a Mechanical Engineer — a full-time, based in United States role. Apply directly on swjtechnology's careers page below.
Mechanical Engineer - Data Center Construction -
Location: United States
SWJ Technology specializes in providing engineering, planning, and project management services across various industries. We are currently seeking Mechanical Engineer - Data Center Construction - for a client in the commercial and industrial construction industry. This is a Contractor or direct hire. If you’re eager to grow your career and make a meaningful impact on exciting projects, we look forward to your application.PURPOSE:
The Mechanical Engineer- Data Center Construction- supports the design, construction, and commissioning of data center facilities. The ideal candidate has hands-on experience with mission-critical environments and is knowledgeable in mechanical systems supporting high-availability, high-density data centers.
RESPONSIBILITIES:
- Design, review, and oversee installation of mechanical systems for data center facilities, including:
- HVAC, chilled water, and air-handling systems
- Cooling strategies (air-cooled, liquid-cooled, and hybrid systems)
- Plumbing, drainage, and fire protection systems
- Support mechanical system layouts in coordination with architectural, structural, and electrical teams
- Review construction drawings, specifications, and submittals for compliance with project requirements and codes
- Coordinate with contractors, vendors, and commissioning agents during construction and startup
- Perform site inspections to ensure quality, safety, and adherence to design intent
- Support commissioning, functional testing, and turnover of mechanical systems
- Participate in risk assessments, value engineering, and constructability reviews
- Troubleshoot mechanical system issues during construction and early operation phases
- Ensure compliance with applicable codes, standards, and client requirements (ASHRAE, NFPA, local building codes)
- Bachelor’s degree in Mechanical Engineering or equivalent
- 5+ years of experience in building construction, with a strong focus on data centers or mission-critical facilities
- Proven experience with HVAC and cooling systems for high-density server environments
- Familiarity with redundancy concepts (N, N+1, 2N) and reliability requirements
- Experience working on active or brownfield data center sites is a plus
- Ability to read and interpret construction drawings and technical specifications
- Strong coordination and communication skills with multidisciplinary teams
- Strong problem-solving and analytical skills
- Ability to work in fast-paced, schedule-driven construction environments
- Attention to detail with a strong focus on quality and reliability
- Effective written and verbal communication skills
- Professional Engineer (PE) license or progress toward licensure
- Experience with commissioning processes and integrated systems testing
- Knowledge of energy efficiency strategies and sustainability initiatives
- Familiarity with BIM / Revit and mechanical modeling tools
- Experience working with hyperscale or colocation data center projects
PHYSICAL REQUIREMENTS:
- Work is normally performed in an office, laboratory, manufacturing floor, or machine shop setting where physical work includes, but is not limited to sitting, standing, reaching, kneeling, bending, and lifting up to 25 lbs.
- Must be able to understand and comply with all relevant safety practices.
FLSA STATUS/WORKING SCHEDULE:
- Location: Confidential, Southern America
- Schedule: Flexible working hours required/ Willingness to travel to project sites as required
- Overtime: As required
- Assignment Start: ASAP
DISCLAIMER:
This job description is a high-level overview of general expectations of this position. It is not intended to list every responsibility of the position, nor does it represent an employment contract of any kind.
SWJ TECHNOLOGY and all of its subsidiaries (i.e., SWJ MACHINING and ProjectOne US) are Equal Opportunity Employers and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, sexual orientation, gender, disability status, protected veteran status, or any other characteristic protected by law.
Get Mechanical Engineer jobs like this→
New roles from thousands of companies land hourly, straight from their careers pages. Get the freshest matches by email so you never miss one.
Email me new jobsSimilar jobs




Frequently asked questions
What skills are required for Mechanical Engineer at swjtechnology?
The required skills for Mechanical Engineer at swjtechnology include: HVAC, BIM, Revit.
What is the seniority level for Mechanical Engineer at swjtechnology?
Mechanical Engineer at swjtechnology is a Senior level position.
How do I apply for Mechanical Engineer at swjtechnology?
You can view the full description and apply for Mechanical Engineer at swjtechnology on EchoJobs: https://echojobs.io/job/swjtechnology-mechanical-engineer-data-center-construction-16z2w.