
Real job — pulled straight from swjtechnology’s careers page · Verified May 24, 2026 · No reposts.
Job description
swjtechnology is hiring a Electrical Engineer, Data Center Construction — a full-time, based in United States role. Apply directly on swjtechnology's careers page below.
Electrical Engineer – Data Center Construction
Location: United States
SWJ Technology specializes in providing engineering, planning, and project management services across various industries. We are currently seeking Electrical Engineer – Data Center Construction- for a client in the commercial and industrial construction industry. This is a Contractor or direct hire. If you’re eager to grow your career and make a meaningful impact on exciting projects, we look forward to your application.PURPOSE:
The Electrical Engineer - Data Center Construction - supports the design, construction, and commissioning of mission-critical data center facilities. The ideal candidate has extensive experience with high-reliability electrical infrastructure and understands the demands of large-scale, high-availability data center environments.
RESPONSIBILITIES:
- Design, review, and oversee installation of electrical systems for data center facilities, including:
- Medium- and low-voltage power distribution systems
- UPS systems, battery energy storage, and backup power systems
- Generators, fuel systems, and transfer switches (ATS/STS)
- Power distribution units (PDUs), remote power panels (RPPs), and busway systems
- Lighting, grounding, and lightning protection systems
- Coordinate electrical design with mechanical, architectural, structural, and IT teams
- Review construction drawings, specifications, and vendor submittals for compliance with design intent and codes
- Support site activities including inspections, QA/QC, and contractor coordination
- Support commissioning, integrated systems testing (IST), and final system turnover
- Ensure compliance with applicable codes and standards (NEC, NFPA, IEEE, local AHJ requirements)
- Participate in risk assessments, reliability studies, and value engineering exercises
- Support electrical system troubleshooting during construction and early operation phases
- Ensure electrical designs meet redundancy and availability requirements (N, N+1, 2N)
QUALIFICATIONS:
- Bachelor’s degree in Electrical Engineering or equivalent
- 5+ years of experience in building construction, with a strong focus on data centers or mission-critical facilities
- Proven experience with critical power infrastructure and redundancy concepts
- Strong knowledge of electrical codes, standards, and safety practices
- Ability to read and interpret construction drawings, one-line diagrams, and technical specifications
- Experience coordinating with utility providers and AHJs
- Strong analytical and problem-solving skills
- Ability to work in fast-paced, schedule-driven construction environments
- High attention to detail and focus on reliability and safety
- Strong written and verbal communication skills
PREFERRED SKILLS:
- Professional Engineer (PE) license or progress toward licensure
- Experience with commissioning and integrated systems testing
- Familiarity with BIM / Revit, SKM, ETAP, or similar electrical modeling tools
- Experience with hyperscale or colocation data center projects
- Knowledge of arc-flash analysis and short-circuit studies
PHYSICAL REQUIREMENTS:
- Work is normally performed in an office, laboratory, manufacturing floor, or machine shop setting where physical work includes, but is not limited to sitting, standing, reaching, kneeling, bending, and lifting up to 25 lbs.
- Must be able to understand and comply with all relevant safety practices.
FLSA STATUS/WORKING SCHEDULE:
- Location: Confidential, Southern America
- Schedule: Flexible working hours required/ Willingness to travel to project sites as required
- Overtime: As required
- Assignment Start: ASAP
DISCLAIMER:
This job description is a high-level overview of general expectations of this position. It is not intended to list every responsibility of the position, nor does it represent an employment contract of any kind.
SWJ TECHNOLOGY and all of its subsidiaries (i.e., SWJ MACHINING and ProjectOne US) are Equal Opportunity Employers and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, sexual orientation, gender, disability status, protected veteran status, or any other characteristic protected by law.
Get Electrical Engineer jobs like this→
New roles from thousands of companies land hourly, straight from their careers pages. Get the freshest matches by email so you never miss one.
Email me new jobsSimilar jobs




Frequently asked questions
What skills are required for Electrical Engineer, Data Center Construction at swjtechnology?
The required skills for Electrical Engineer, Data Center Construction at swjtechnology include: BIM, Revit.
What is the seniority level for Electrical Engineer, Data Center Construction at swjtechnology?
Electrical Engineer, Data Center Construction at swjtechnology is a Senior level position.
How do I apply for Electrical Engineer, Data Center Construction at swjtechnology?
You can view the full description and apply for Electrical Engineer, Data Center Construction at swjtechnology on EchoJobs: https://echojobs.io/job/swjtechnology-electrical-engineer-data-center-construction-lrevx.